How Long Does a Kitchen Remodel Take?

When homeowners come to us ready to transform their kitchen, one of the first questions they ask is: “How long will this take?” And it’s a fair question. Kitchens are central hubs in daily life, and living without one temporarily can be challenging. There’s no one-size-fits-all answer. The timeline for a kitchen remodel can vary widely based on your goals, your home’s current layout, the scope of work, and even the permitting process in your specific municipality. Legacy Builders Group believes in being upfront, transparent, and incredibly thorough, so in this post, we’re breaking down exactly what goes into a quality design-build kitchen remodeling timeline and why our clients consistently say the wait is well worth it.

Cincinnati, OH kitchen remodel with window behind sink by Legacy Builders

Why Timelines Vary in Kitchen Remodeling

Kitchen remodels are like good recipes. Start with quality ingredients and give it time to simmer. Before laying out the numbers and weeks on the calendar, let’s talk about the ingredients that make each project unique. Here are a few of the most common variables influencing how long your Cincinnati kitchen remodel will take.

  • Scope of Work – Are we knocking down walls, reconfiguring your floor plan, or relocating cabinetry and countertops? Bigger changes mean more planning and more construction time.

  • Permits and Municipal Requirements – Every city or township operates a little differently. Some building departments issue permits in a few weeks; others take longer, especially for projects involving additions, septic systems, or zoning variances.

  • Selections and Customization – From cabinetry to tile to lighting, every selection has a lead time. Choosing custom options (which many of our clients love) adds time up front but can save time and stress during construction and pay dividends in your daily experience long after the project is complete.

  • Decision-Making and Revisions – It’s your home, and you deserve to love every detail. Taking the time to make confident, informed decisions early in the process helps us keep everything moving forward smoothly once construction begins.

Legacy Builders Group’s Design-Build Process: Why Planning Matters

At Legacy Builders Group, we approach remodeling a little differently than most. We are here to guide you through the entire process, from concept to completion. And with our recent expansion into custom cabinetry, we’ve taken even greater control over the quality and coordination of our projects. We’re not rushing through critical planning steps. Instead, we’re taking the time to deeply understand how you live and use your space and how we can design a kitchen that truly enhances your daily life.

Island in White Oak, OH two tone kitchen remodel by Legacy Builders

Our Design Phase (Approx. 4 Months)

It’s an exciting phase, and we make it enjoyable, not overwhelming. By the time we’re finished with design, you’ll have a clear visual of your future kitchen, confidence in your selections, and a well-prepared roadmap for construction. In the first several weeks, we will collaborate on the following:

  • Develop a detailed space plan

  • Refine layout options

  • Explore finishes, fixtures, and materials

  • Customize cabinetry to fit your needs

  • Guide what selections will make the most impact within budget

  • Address any structural or permitting considerations

Legacy Builders team on computer at office planning for upcoming remodeling project in Cincinnati

Pre-Construction & Permitting (About 1 Month)

Once design is complete, we move into the prep phase. We navigate all of this on your behalf, keeping you informed every step of the way. We’re well-versed in the quirks of local building departments and work hard to keep things moving forward. This stage includes steps such as:

  • Securing necessary permits (timeline varies by municipality)

  • Finalizing documentation

  • Ordering materials

  • Scheduling your build with trades

Construction Phase (8-16+ Weeks)

This is the part most people focus on, but it’s actually the most variable piece of the puzzle. Based on recent projects, here’s what we typically see.

Project Type

Estimated Timeline

Small Kitchen Remodel

8–10 weeks

Full Kitchen Remodel

10–14 weeks

Kitchen Plus (1st Floor Updates)

12–16 weeks

Kitchen + Addition/Structural Work

5+ months

Front Facade Updates (optional tie-in)

~12 weeks (scope dependent)

How Legacy Builders Group Keeps Projects on Track

Timelines may vary, but one thing remains consistent: our commitment to delivering a smooth, well-managed remodeling experience. We don’t cut corners unless you ask for rounded countertop edges. At Legacy Builders Group, we’re intentional about every step we take because we know that even the best design falls short without a solid process behind it. Here’s how we keep your kitchen remodel moving efficiently from start to finish.

Evendale, OH kitchen remodel with island and storage by Legacy Builders

Thorough Pre-Planning

We don’t rush through the early stages. Instead, we invest in detailed planning so you don’t face costly surprises or frustrating delays down the road. Our design team helps you make confident, lasting decisions that hold up once the hammers start swinging.

Custom Cabinetry, In-House

Bringing cabinetry production under our own roof gives us tighter control over timelines and craftsmanship. You won’t be waiting on third-party suppliers or unknown shipping delays. Instead, your cabinets are built to spec, on schedule, and with the same care we bring to the rest of your home.

White kitchen remodel in Cincinnati, OH with white subway tile backsplash and paneled refrigerator cabinetry

Dedicated Project Management

When construction begins, we hand the baton to our experienced production team. From timelines and trade coordination to keeping the job site tidy and your family informed, our project managers are your on-the-ground support every step of the way.

Realistic Scheduling (with Built-In Buffer Time)

We’ve been remodeling Cincinnati-area homes for generations. That means we build our schedules based on real-world experience, not wishful thinking. We also factor in weather, inspections, and the unexpected (because it happens!) so your timeline stays as accurate as possible.

Ongoing Communication

We keep you in the loop with regular updates, milestone check-ins, and complete transparency because we believe informed clients make for happy homeowners.

Kitchen island with seating, oven, and pull-out cabinetry beneath three pendant glass light fixtures

Your Cincinnati Kitchen Remodel Done Right and On Time

There’s no universal answer to “How long does a kitchen remodel take?” But with the right team, the right plan, and the right process, the experience can feel less like a disruption and more like an exciting transformation. Legacy Builders Group is here to build trust, clarity, and a space your family can enjoy for years to come. Ready to talk about your kitchen remodel or other home improvement project? Let’s start the conversation. We’ll help you understand what’s possible, how long it will realistically take, and how to make the most of every step.

Contact us today to schedule a consultation and discover how The Legacy Way makes all the difference.