When homeowners come to us ready to transform their kitchen, one of the first questions they ask is: “How long will this take?” And it’s a fair question. Kitchens are central hubs in daily life, and living without one temporarily can be challenging. There’s no one-size-fits-all answer. The timeline for a kitchen remodel can vary widely based on your goals, your home’s current layout, the scope of work, and even the permitting process in your specific municipality. Legacy Builders Group believes in being upfront, transparent, and incredibly thorough, so in this post, we’re breaking down exactly what goes into a quality design-build kitchen remodeling timeline and why our clients consistently say the wait is well worth it.
Kitchen remodels are like good recipes. Start with quality ingredients and give it time to simmer. Before laying out the numbers and weeks on the calendar, let’s talk about the ingredients that make each project unique. Here are a few of the most common variables influencing how long your Cincinnati kitchen remodel will take.
At Legacy Builders Group, we approach remodeling a little differently than most. We are here to guide you through the entire process, from concept to completion. And with our recent expansion into custom cabinetry, we’ve taken even greater control over the quality and coordination of our projects. We’re not rushing through critical planning steps. Instead, we’re taking the time to deeply understand how you live and use your space and how we can design a kitchen that truly enhances your daily life.
It’s an exciting phase, and we make it enjoyable, not overwhelming. By the time we’re finished with design, you’ll have a clear visual of your future kitchen, confidence in your selections, and a well-prepared roadmap for construction. In the first several weeks, we will collaborate on the following:
Develop a detailed space plan
Refine layout options
Explore finishes, fixtures, and materials
Customize cabinetry to fit your needs
Guide what selections will make the most impact within budget
Address any structural or permitting considerations
Once design is complete, we move into the prep phase. We navigate all of this on your behalf, keeping you informed every step of the way. We’re well-versed in the quirks of local building departments and work hard to keep things moving forward. This stage includes steps such as:
This is the part most people focus on, but it’s actually the most variable piece of the puzzle. Based on recent projects, here’s what we typically see.
Project Type |
Estimated Timeline |
Small Kitchen Remodel |
8–10 weeks |
Full Kitchen Remodel |
10–14 weeks |
Kitchen Plus (1st Floor Updates) |
12–16 weeks |
Kitchen + Addition/Structural Work |
5+ months |
Front Facade Updates (optional tie-in) |
~12 weeks (scope dependent) |
Timelines may vary, but one thing remains consistent: our commitment to delivering a smooth, well-managed remodeling experience. We don’t cut corners unless you ask for rounded countertop edges. At Legacy Builders Group, we’re intentional about every step we take because we know that even the best design falls short without a solid process behind it. Here’s how we keep your kitchen remodel moving efficiently from start to finish.
We don’t rush through the early stages. Instead, we invest in detailed planning so you don’t face costly surprises or frustrating delays down the road. Our design team helps you make confident, lasting decisions that hold up once the hammers start swinging.
Bringing cabinetry production under our own roof gives us tighter control over timelines and craftsmanship. You won’t be waiting on third-party suppliers or unknown shipping delays. Instead, your cabinets are built to spec, on schedule, and with the same care we bring to the rest of your home.
When construction begins, we hand the baton to our experienced production team. From timelines and trade coordination to keeping the job site tidy and your family informed, our project managers are your on-the-ground support every step of the way.
We’ve been remodeling Cincinnati-area homes for generations. That means we build our schedules based on real-world experience, not wishful thinking. We also factor in weather, inspections, and the unexpected (because it happens!) so your timeline stays as accurate as possible.
We keep you in the loop with regular updates, milestone check-ins, and complete transparency because we believe informed clients make for happy homeowners.
There’s no universal answer to “How long does a kitchen remodel take?” But with the right team, the right plan, and the right process, the experience can feel less like a disruption and more like an exciting transformation. Legacy Builders Group is here to build trust, clarity, and a space your family can enjoy for years to come. Ready to talk about your kitchen remodel or other home improvement project? Let’s start the conversation. We’ll help you understand what’s possible, how long it will realistically take, and how to make the most of every step.